THE ROADBLOCK

The engineers were busy laying down the essential elements of Project Helios, bringing Marvin’s vision closer to life.

Power conduits were being installed to channel the energy needed for the system, ensuring that every part of the project would receive consistent and sufficient power.

Networking cables snaked throughout the site, linking various control points to create a seamless communication pathway, while state-of-the-art cooling systems were set up, specially designed to maintain thermal stability by preventing any dangerous heat build-up.

This meticulous installation was crucial; without these components, the system wouldn’t be able to handle the anticipated surge in data and solar energy flow.

Suddenly, as they neared the end of their cabling setup, one of the engineers walked towards Marvin. He was sweating and he looked worried.

Once he reached where he was, he said. “Mr. Marvin, we’ve run out of networking cables!” The cables they had brought weren’t enough.

Marvin didn’
Continue to read this book on the App

Related Chapters

Latest Chapter